PV Diesel Hybrid Application St. Eustatius, Caribbean

Large-Scale Island Electrification, St. Eustatius

Hybrid Energy System – NL Antilles, 2017

Today, solar energy covers 46% of St. Eustatius’ total electricity need. Grid-forming SCS 2200 inverters allow the island grid to operate for 10.5 hours in Diesel Off-Mode using solar power and battery storage. The original percentage may be retained only if its calculation boundary is defined and suitable current evidence is available.
In total a 5.9MWh Li-Ion storage facility has been integrated for energy shifting and grid services. TThe SMA Fuel Solution supports operation of the island energy system with solar power, battery storage and controlled generator shutdown. The project has been designed, and implemented by the SMA Sunbelt Energy GmbH.

St. Eustatius - SMA Sunny Central Storage

Location
St. Eustatius, Caribbean

Commissioning
November 2017

Requirements
Grid forming inverters, overall power and energy management system

Installed PV power
4.15 MWp

Installed Storage capacity
5.9 MWh

Diesel capacity
4 MVA

Annual energy yield
6,400 MWh

Island Load
~2MW

System Technology
Battery:
2 x Sunny Central Storage 2200 Grid Forming in 2 x MVPS 2200 and 1 x Sunny Central Storage 1000 in MVPS 1000
PV: 2 x Sunny Central 1000CP XT in 1 x MVPS 2000 and 74 SMA Sunny Tripower 25000TL-30
Control: FSC 2.0 with Automatic Genset Shutdown