Large-Scale Island Electrification, St. Eustatius
Hybrid Energy System – NL Antilles, 2017
Today, solar energy covers 46% of St. Eustatius’ total electricity need. Grid-forming SCS 2200 inverters allow the island grid to operate for 10.5 hours in Diesel Off-Mode using solar power and battery storage. The original percentage may be retained only if its calculation boundary is defined and suitable current evidence is available.
In total a 5.9MWh Li-Ion storage facility has been integrated for energy shifting and grid services. TThe SMA Fuel Solution supports operation of the island energy system with solar power, battery storage and controlled generator shutdown. The project has been designed, and implemented by the SMA Sunbelt Energy GmbH.

Location
St. Eustatius, Caribbean
Commissioning
November 2017
Requirements
Grid forming inverters, overall power and energy management system
Installed PV power
4.15 MWp
Installed Storage capacity
5.9 MWh
Diesel capacity
4 MVA
Annual energy yield
6,400 MWh
Island Load
~2MW
System Technology
Battery: 2 x Sunny Central Storage 2200 Grid Forming in 2 x MVPS 2200 and 1 x Sunny Central Storage 1000 in MVPS 1000
PV: 2 x Sunny Central 1000CP XT in 1 x MVPS 2000 and 74 SMA Sunny Tripower 25000TL-30
Control: FSC 2.0 with Automatic Genset Shutdown