Solar park Bickendorf, Germany

Utility-Scale PV Power Plant – Germany, 2017

Solarpark Bickendorf / 7 MW

The Bickendorf solar park has been built in three subareas along a highway and supplies about 2,000 neighboring households with clean solar power.

The WES Green GmbH has decided to use Sunny Tripower CORE1 inverters in its project because of some severe dips and rises of the terrain, on both sides of the A60 freeway, in the western part of Germany. The Sunny Tripower CORE1 with its 12 strings allocated on 6 MPPTs allows for maximum energy yields even if the distances between module rows are narrow.

SMA Sunny Tripower CORE1

¿Preguntas? Consultar a un experto de SMA
Contactar

Ver otras referencias
Ir a la vista general