80 SMA Sunny Tripower 25000 TL and 8800 modules work together to produce about 3,658 MWh clean energy every year.
The PV power plant located in the south of Turkey not very far from the Mediterranean sea had to be carefully planned so that shadow effects caused by the surrounding mountains could be avoided.
Location
Kemeragzi, Antalya, Turkey
Commissioning
2015
Specific requirements
Hilly terrain
Nominal power
2.288 MWp
Annual energy yield
3,658 MWh
CO2 savings
2,561 tons/ year
System Technology